More Information

For more information about any of the projects or the eminent domain process, please contact us at (407) 843-0404 or attorney@hhbslaw.com.

Search

I-95 from SR 50 to Volusia County Line

Updated: May 14th, 2007

Project Overview:

This project involves the widening of I-95 from SR 50 to the Volusia County line. The widening is planned toward the median with no additional right of way needed for the new lanes. Right of way acquisition will be for water retention areas.  The project is located in Brevard County.

Read more about this project »

Condemning Authority - Florida Department of Transportation | No Comments »

Minneola Collector Road PD&E Study

Updated: September 16th, 2008

Project Overview:

The Minneola Collector Road PD&E project begins in the area of Old SR 50, near where North Hancock Road terminates today and extends north towards the Turnpike. The study will also propose a new interchange at the Turnpike extending towards the west where it terminates at US 27.

Read more about this project »

Condemning Authority - Lake County | No Comments »

SR 50 from east ramps Turnpike to Avalon Road

Updated: June 17th, 2008

Project Overview:

This project involves the widening and reconstructing of SR 50 from the east ramp on Turnpike to Avalon Road. The total project length is 1.269 miles. The project is located in Orange County.

Read more about this project »

Condemning Authority - Florida Department of Transportation | No Comments »

SR 84 (Davis Boulevard) from Santa Barbara Boulevard to CR 951

Updated: June 17th, 2008

Project Overview:

This project is located on SR 84 (Davis Boulevard) from west of Santa Barbara Boulevard to east of CR 951, a distance of approximately 3 miles. The roadway will be widened to six lanes. The project is located in Collier County.

Read more about this project »

Condemning Authority - Florida Department of Transportation | No Comments »

SR 436 Interchange at I-4 Improvements

Updated: September 27th, 2007

Project Overview:

This project involves improvements to the SR 436 and I-4 interchange. The proposed improvements will increase the SR 436 interchange capacity by improving drainage, a pedestrian walkway and one traffic signal controlling the entire interchange.  The project is located in Seminole County.
Read more about this project »

Condemning Authority - Florida Department of Transportation | No Comments »

I-4 Interchange at SR 46

Updated: June 17th, 2008

Project Overview:

This project involves improvements to the SR 46 interchange off of I-4. The proposed interchange improvements involve a new loop entrance ramp from westbound SR 46 to westbound I-4. There will be a new exit ramp from westbound I-4 to SR 46. The project is located in Seminole County.

Read more about this project »

Condemning Authority - Florida Department of Transportation | No Comments »

I-75 from SR 470 to SR 91 (Florida’s Turnpike)

Updated: June 17th, 2008

Project Overview:

This project involves the proposed widening of I-75 from SR 470 to Florida’s Turnpike. The total project length is 7.025 miles. The project is located in Sumter County.

Read more about this project »

Condemning Authority - Florida Department of Transportation | No Comments »

I-75 from Hernando County Line to SR 470

Updated: June 17th, 2008

Project Overview:

This project involves the proposed widening of I-75 from the Hernando County Line to SR 470. The approximate project length is 14.475 miles. The project is located in Sumter County.

Read more about this project »

Condemning Authority - Florida Department of Transportation | No Comments »

SR 40 from SR 45 (US 41) to CR 328

Updated: June 17th, 2008

Project Overview:

This project involves the proposed widening and reconstruction of SR 40 from SR 45 to CR 328. Approximate project length is 9.763 miles. The project is located in Marion County.

Read more about this project »

Condemning Authority - Florida Department of Transportation | No Comments »

SR 60 and 58th Avenue

Updated: September 5th, 2008

Project Overview:

This project includes improvements to the intersection as well as widening 58th Avenue from College Lane to 26th Street from 4 lane to 6 lane. Plans for the intersection include to have three through lanes plus dual left turn lanes and a right turn lane in every direction except for the north bound 58th Avenue approach.  The project is located in Indian River County.

Read more about this project »

Condemning Authority - Indian River County | No Comments »

« Previous Projects       More Projects »